Manufacturing Support and Facility Operations Contract (MSFOC) – Michoud
Assembly Facility
Sierra Lobo is responsible for providing mission-focused
integrated production and facility operation support to NASA projects and other
on-site user(s)/tenant(s) as the Michoud facility is transforming from a
single-project, single-prime contractor facility to a multi-project,
multi-prime contractor facility.
Sierra Lobo provides support in an integrated contract team
environment in the following capacities:
Program Management
·
Technical Management
·
Work Management
·
Documentation and Records Management
·
Configuration Management
·
Training and Certification
·
Quality and Workmanship
Safety, Health, and Emergency Management
·
Occupational Health Program
·
Industrial Safety Program
Manufacturing Support
·
Integration of Manufacturing Operations
·
Integration Roles and Responsibilities
Maintenance
·
Maintenance Planning
·
Annual Work Plan
·
Five Year Maintenance Plan
·
Facility Condition Assessment
·
Work Order Planning and Scheduling
·
Preventive Maintenance
·
Corrective Maintenance
·
Maintenance Workmanship and Materials
·
Corrective Maintenance Work Order
Documentation
·
Reliability Centered Maintenance
·
Reliability Centered Maintenance Approach
·
Reliability Centered Maintenance Engineering
·
Maintenance Projects
·
Maintenance Engineering
·
Pressure Vessels Systems Management
·
Other Maintenance Activities
Site Services
·
Multimedia Services
·
Graphics Department
·
Content Development and Assembly
·
Content Distribution
Site Operations
·
Power Plant Operations
·
Industrial Waste Water Treatment
Logistics Operations Services
·
Property Management
·
Supply and Material Management
·
Redistribution, Utilization, and Disposal
·
Receiving and Inspection
·
Packing and Shipping Operations
Sustaining Engineering
·
Facility Planning
·
General Planning and Administration
·
Construction of Facilities
·
Engineering Assessments
·
Space Utilization
·
Master Planning
·
Engineering Support Services
·
Drawings and Software Configuration Control
·
Facility Systems Equipment Utilities (FSEU)
Drawing Maintenance and Distribution
·
Cost Estimating
·
Budgetary/Conceptual Cost Estimates
·
Construction Cost Estimates
·
Design Estimate Validation
·
Change Items and Claims
·
Maintenance of Mean’s Database
·
Estimating Schedules
Environmental Services
·
Spill Response and Clean-up
Construction Management
·
Local Projects
·
Construction Project Management
·
Authorization
·
Change Items, Request for Information and
Claims
·
Project Execution
·
Construction of Facilities Projects
·
Construction Project Management
·
Schedules
·
Change Items, Request for Information and
Claims
·
Project Execution
|